Other Group Websites
 
Why H2-GO?


The patent advantages of H2-GO and the hydroblast road marking removal system it offers to clients are numerous and distinctly advantageous.

No other system offers the same level of versatility and performance.
  • Little to no damage to road and pavement surfaces.
  • The most advanced and environmentally friendly option for road marking removal.
  • Removes all types of UK road markings from concrete and asphalt safely and quietly.
  • The self-contained unit has no need for men on foot during the removal process.
  • Will also remove a range of other materials, including anti-skid.
  • The single step process needs no secondary clean-up.
  • Waste water is filtered to 100 microns and can be discharged into surface water drains.
  • Patented vacuum recovery system leaves road clean and almost dry.

It can be operated in areas of sensitivity such as food production and storage, airfields in the presence of volatile substances, and crowded public areas. All waste is vacuumed recovered and stored until it can be safely disposed.

  • Below, the picture shows process debris from the hydroblaster. The debris is discharged in a dry solid state.
 

Its flexibility allows it to be used on surfaces other than roads, car parks and other traffic movement areas. In particular it is highly effective in assisting in cosmetic improvements to urban areas by the removal of chewing gum, paint and other defacing materials from pavement areas.

 
Road Retexturing
 
Re-texturing of asphalt surfaces to restore the skid resistance and texture depth to safe and desired levels is also made possible by the H2-GO hydroblaster. Excess binder which has bleed to the surface on surface dressed roads is removed.
 
  • The below pictures shows a surface dressed road after retexturising has been completed.
 
 

26/06/2008
Shildon Thermoplastics - New Glass Bead Silo
Shildon Thermoplastics have erected a 40 tonne silo to hold glass beads. The silo was installed t ...more details

26/06/2008
Coupe Line - A688 - Bowburn to Wheatley Hill Bypass - Phase 1
Coupe Line have completed the first phase on the A688, Bowburn to Wheatley Hill Bypass, County Durha ...more details

26/06/2008
H2-GO - New hydroblaster!
The new H2-GO hydroblast machine is coming to a road near you in August! With both a truck mounte ...more details


  Registered Office
Coupe Construction Ltd
Station Lane
Birtley
Chester-le-Street
County Durham
DH2 1AW
United Kingdom



Subsidiary Office
H2-GO
Hackworth Industrial Park
Shildon
County Durham
DL4 1HG
United Kingdom


T: 01388 770 546
F: 01388 776 010